Campus Updates
11.15.07
At this time, the construction has been completed, and we’re very pleased with the way the building has turned out. The very last touch-ups are being done, so please continue to pray as these things are being finished:
- The last of the furniture is being arranged and the artwork is being hung.
- The games for the youth area are being installed.
- The final testing on the air system is being done.
- The final detailing of the audio, video and lighting systems is being completed.
- The skate park and the patio still need to be finished.
- All the floors and fixtures are being dusted and polished.



