11.01.07
• The rest of the carpet is being installed in the building.
• Doors and cabinets are being hung.
• The light fixtures are being installed.
• The exterior of the building is being refinished.
• Concrete for the skate park and patio is being poured.
• Bookstore displays are being installed.
• The landscape is complete with the exception of the Davis Blvd entrance. All landscape will be finished after the sign is completed.