Campus Updates

11.01.07

• The rest of the carpet is being installed in the building.

• Doors and cabinets are being hung.

• The light fixtures are being installed.

• The exterior of the building is being refinished.

• Concrete for the skate park and patio is being poured.

• Bookstore displays are being installed.

• The landscape is complete with the exception of the Davis Blvd entrance. All landscape will be finished after the sign is completed.